ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

An NHTSA study found that the average inpatient costs for crash victims who were not using safety belts were __________ percent higher than for those who were b
Who assassinated President John F. Kennedy? Jack Ruby Lee Harvey Oswald Yuri Gagarin Alan Shepard
hi may someone help me out with this please
Which statement is correct about a line and a point? A line and a point can be collinear. A point has no location, and a line has many points located on it.
What is the REGULAR ending for an -ar verb in the "ustedes" form?
what should you pay attention to when you see a title for the first time?
you shall no longer take things at second or third hand, nor look through the eyes of the dead, nor feed on the spectres in books, you shall not look through my
sodium is an explosive metal. chlorine is a poisonous gas. you would expect a compound made of sodium and chlorine to be a) very dangerous b) very explosive and
How is security handled in free market
3x + 2y = 4 2x - y = 5 (a) This system of equations has no solution. (b) has one solution. (c) is coincident.