lopeziris3447 lopeziris3447
  • 01-03-2022
  • Computers and Technology
contestada

A CPU scheduler that assigns higher priority to the I/O-bound processes than the CPU-bound processes causes:

Respuesta :

AliMay050
AliMay050 AliMay050
  • 01-03-2022

Answer:

Low CPU utilization and high I/O utilization

Explanation:

Answer Link

Otras preguntas

How do cells grow and reproduce to maintain homeostasis?
How were the englightenment and romanticism different
Several kinds of bears are found on Earth. Most bears are brown or black, but one type of bear, the polar bear, is white. What process led to this difference in
What are some possible short and long term medical concerns for crew members on longer space exploration trips
This element exists in adundance in the sun.Explain how you would go about capturing sunlight.Would this captured sunlight contain any of the element?
Stephanie runs three days a week. She ran 3 2/3 miles on Monday , 4 1/5 miles on Wednesday , and 2 2/9 miles on Friday. How many miles did she run this week ?
who led the continental army in the final decisive battle of the revolutionary war at Yorktown
Barrett is comparing the membership fees for two museums. The art museum charges a one-time fee of $8.25 plus $2.25 per month. The science museum charges a one-
Which sociologist posits that, as a society modernizes, it must rely less on tradition, and more on rational, and impersonal procedures?
0.75,1.75,2.75,3.75 is arithmetic or geometric?