a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

How do development within each domain is linked to and affected by development in other domain.
Can someone help me please
what is computer generation​
If the earth were the size of an apple, which piece would best represent the amount of mass of the atmosphere? O the skin O the meat O the stem O Oops..... I a
The AP Biology teacher is measuring out 638.0 g of dextrose (C6H12O6) for a lab. How many moles of dextrose is this equivalent to?
How much of planet Earth is covered in water? Group of answer choices Between 50 - 69% Above 70% Below 50%
A square its diagonal length = 12cm then its area =
What's the length of an arc with a central angle of 120and a radius of 5 inches?
The half-life of Iodine-131 is 8.0252 days. If 14.2 grams of I-131 is released in Japan and takes 31.8 days to travel across the Pacific, how much I-131 will be
A. 0 m/s B. -0.17 m/s C. 12 m/s D. 0.17 m/s