Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

Which of the following are considered measures of variability? I. mean II. interquartile range III. mean absolute deviation
What’s this photos answer?
What is the completely factored form of x^4+8^2-9?
The sum of 5 consecutive integers is 110. What is the fourth number in this sequence?
Dorothy is making passed appetizers. She has leftover raw salmon, dairy products, a baguette, and some random herbs. What can she make? When utilizing left ove
The executive branch under the president, including the cabinet, is called the
The height of an equilateral triangle is four square root three what is the perimeter of the equilateral triangle
what is the genotype for white chickens ​
Find the surface area of a square pyramid where the length of a side of the base is 10cm and the slant height of the pyramind is 16cm
which of the following characteristics of the 1920s economy led to the Great Depression​