leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

If 52 x equals 7800 y what does 1 x equal? What is the maths equation?
what is force ?is it desirable or undesirable?
An ice cube is dropped into boiling water. How will heat flow between the water and the ice cube?
Two diverging light rays, originating from the same point, have an angle of 5° between them. After the rays reflect from a plane mirror, what is the angle betwe
Tennis balls with a diameter of 2.5 in. are packaged 3 to a can. The can is a cylinder. Find the volume of the space in the can that is not occupied by tennis b
take 2 identical bowls filled with water.shine a spotlight on one and place one away from the spotlight in the same room. which shows higher evaporation and why
find the amplitude, period, and phase shift of the function defined by: y=3-2cos(3x+pi)
What was the South’s greatest concern when California applied for statehood?
what does como eres tu mean in spanish?
Compute the odds in favor of rolling a sum of 10 in a single roll of two fair dice