medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Solve cos x - square 1-3 cos^2 x = 0 given that 0° < x < 360°
Gretchen works at a department store. She earns a 12% commission on the perfume that she sells and a 6% commission on the clothes that she sells. Gretchen sells
I need help with this math question
PLEASE HELP WILL GIVE BRAINLIEST : When Oedipus refers to "my mother's bed- I am afraid of that", what fear is he referring to? A) He is afraid of the darkB) He
Which word best completes the sentence? Una ______________es lo que recibes del doctor. receta resfrío herida
Vertical Angles. 38 degrees, 2x+6 degrees. Whats x?
are you able to rewrite the term 33 as a product of 11 and another factor? i would really love it for you to reply back as soon as possible because my grades ar
How many solutions are there for the system of equations shown on the graph? 1)No solution 2)One solution 3)Two solutions 4)Infinitely many solutions
The diameter of a circle is 38 millimeters. What is the circle's circumference?
Who is the speaker of this poem? O an observer, like a fly on the wall the old woman o the old man the plates