reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

Find the missing dimension. Round your answer to the nearest tenth. Please help me answer this problem. :) thanks.
Where did large numbers of Asian immigrants settle between 1890 and 1910? in the South in the Midwest on the East Coast on the West Coast
Why is most space exploration accomplished with spacecraft that do not have astronauts on board
How many times does 5 go into 2000000?
The addition of heat energy to a system always causes the temperature of that system to increase. True False
• What is value chain analysis?
How are Cicero’s writings different from Juvenal’s
Because of its importance in summarizing your strategy, the Introduction and Overview of your business plan should be a. lengthy and detailed. b. repeated in
Change the sentense into simple past tense : shinta writes the beutifull poem
XZ=15 and the perimeter of XWZ is 50. what is the length of WZ?